Write an estimate as a short, itemized document: who you are, the job address, the work broken into line items with prices, what’s not included, how long the price is good for, payment terms, and a place for the customer to sign. Price it from your costs plus overhead plus profit, not from what the last contractor charged. And treat a signed estimate as what it may become: the contract. Below: a checklist, a pricing method, estimate vs quote vs bid, and the rules on e-signatures, deposits and three-day cancellations.

This is general information, not legal advice; contractor rules vary by state.

What should a job estimate include?

  1. Your business name, license number and contact details, and the customer’s name and job address.
  2. An estimate number and date.
  3. The work as line items: materials, labor, equipment, permits and disposal, each with a quantity and price.
  4. What’s not included and what you assumed (“assumes existing subfloor is sound; replacement priced separately”). This is where most disputes start.
  5. Options, if there’s a sensible add-on or a better/best choice.
  6. Timeline: when you can start and roughly how long it takes.
  7. How long the price is good for. Thirty days is common; materials move.
  8. Payment terms: deposit, when the balance is due, how they can pay, and any cash discount.
  9. How changes are handled: extra work is priced and agreed in writing before you do it.
  10. A signature line, or an approve button if you send it online.
  11. Any disclosure your state requires. California, for example, requires a commercial general liability insurance disclosure with estimates meant to lead to a home improvement contract (16 CCR §872).

How do you price a job estimate?

Build it up from your costs, line by line:

  1. Materials at what you’ll actually pay, including delivery and waste.
  2. Labor: hours for each person times what that hour really costs you (wages plus payroll taxes, insurance and benefits).
  3. Equipment, permits and disposal.
  4. Overhead: your share of the truck, insurance, phone, software, office and unpaid time. Add up a year of it, divide by your billable hours, and add that per hour.
  5. Profit: a margin on top of everything above. It pays for slow months, mistakes and growth. Without it you’re working for wages.

The two most common pricing mistakes are leaving out overhead (the job looks profitable until the truck needs tires) and pricing to match the cheapest competitor. If your price is higher, the line items and exclusions are how you show what the customer is getting.

What’s the difference between an estimate, a quote and a bid?

The words get used loosely. In home services, an estimate is often treated as a ballpark and a quote as a firm price for a specific job. Construction uses them differently: Procore uses “estimate” for the contractor’s own cost calculation, “quote” for a supplier’s price on materials, and “bid” for “a document that offers to perform a specific job at a specific price,” usually in a competitive process.

What matters more than the label is what you write on it and whether the customer signs. California’s licensing board warns consumers that “anything you sign as authorization to move forward with the project could become the contract” (CSLB). If the number is firm, say so; if it’s a range, say what would change it.

Hear the receptionist take a real call — it rings your phone in about a minute.

Is an e-signature on an estimate legally valid?

Generally yes, in the US. The federal ESIGN Act says a contract “may not be denied legal effect, validity, or enforceability solely because an electronic signature or electronic record was used in its formation” (15 USC 7001). Keep a record of who signed, when, and what version of the estimate they saw.

What rules apply to deposits and cancellations?

Two you should know:

  • The FTC’s three-day Cooling-Off Rule gives buyers until midnight of the third business day to cancel certain sales made at their home, for a price of $25 or more (or $130 or more at other places away from your business) (16 CFR 429.0, 429.1). It excludes repairs or maintenance where the customer contacted you and asked you to come out, but not extra goods or services you sell on that visit, other than replacement parts. So a repair the customer called you out for is usually outside it. A new install or replacement signed at their home can be inside it, even if they invited you, as can an add-on sold on a repair visit; then you owe the customer a copy of the contract, a written cancellation notice and an oral explanation of their right to cancel.
  • State contract and deposit rules. California is a common example: a home improvement contract over $500 must be in writing and signed, the down payment may not exceed $1,000 or 10% of the contract price, whichever is less, and change orders become part of the contract once they’re in writing and signed before that work starts (B&P Code §7159; CSLB). Check your own state’s licensing board.

A short example

Oak Ridge Painting, Lic. #000000, (555) 010-0000. Estimate #2041, Nov 20, 2026, valid 30 days For: Dana Lee, 14 Elm St. Interior repaint, living room and hall.

Item Qty Price
Prep: patch, sand, caulk 1 $320
Walls, 2 coats, labor 2 rooms $1,180
Paint and supplies 1 $410
Ceilings, 1 coat (optional) 2 rooms $380
Total (without optional ceilings) $1,910

Not included: furniture moving beyond the center of the room; drywall replacement. Start within two weeks of approval, two working days. Payment: balance due on completion; card, cash or check. Changes priced and agreed in writing first. Approve: (signature)

How do you write estimates in Stack Space?

Stack Space estimates have line items with quantities and prices, a description under each line that the customer reads, and optional add-ons the customer ticks in or out when they approve; the total follows their choice. Internal costing lines stay on your copy only. Each estimate shows how long it’s valid (30 days unless you change it). If you offer a cash discount, both totals sit right above the signature.

The customer gets the estimate by email and text and approves it with a typed signature on the page (or a full e-signature if you require one); with “create the job automatically” on, a clear “yes, go ahead” on a call or in a text approves it too, and the job is created. If they don’t answer, reminders go at 4 and 14 days (how to follow up on an estimate).

You can also have the estimate drafted from a call: the AI receptionist transcribes it, and the Proposal Writer prices the lines from your own price list (or a price said on the call), leaving anything else as a $0 line marked PRICE NEEDED for you to fill in (how that works). Stack Space doesn’t take deposits on estimates; payment is the whole balance on the invoice. Plans are $125 a month (Starter) or $355 (Professional), with no free trial.

Where others fit: if you want several pricing options in one estimate, Housecall Pro’s estimates do that, and some field-service tools take a deposit at approval.

FAQ

What should a contractor estimate include? Your business and license details, the customer and job address, itemized line items with prices, exclusions and assumptions, timeline, how long the price is valid, payment terms, how changes are handled, and a signature line.

Is a job estimate legally binding? It can be. Once the customer signs it as approval to go ahead, it may become the contract, as California’s licensing board warns. Write it as if it will be.

How do I calculate an estimate for a job? Materials plus labor (at your real hourly cost) plus equipment, permits and disposal, then overhead per hour, then a profit margin on top.

Should I charge for estimates? Many contractors give simple estimates free and charge for detailed design or diagnostic visits, sometimes credited against the job (what to charge for a service call). Say which in your booking confirmation (appointment reminder text templates).

How long should an estimate be valid? Thirty days is common. Shorter if your material prices move fast; always state it on the estimate.

Run your whole business on one platform.

Full CRM + AI included from $125/mo · no contracts · cancel in two clicks

Start today

What it did for our family’s tree service

Before Stack Space, the phone rang all day, the voicemail box was full and the estimates lived on paper. Here’s what changed once it started answering.

Book a 20-minute demo
30–60%
more bookings since the receptionist started answering
20%
more jobs they wouldn’t have won before, on top of their usual close rate
3×
the website visits since Stack Space built the new site
50%
higher review rate

All approximate, from the family business’s own count, with no published baseline. Your numbers will depend on your trade and your calls. Read the case study

The 60-second demo

Skip the sales call. Take one from the receptionist Stax trains instead.

Type your number and the receptionist Stax trains calls you back — usually within a minute between 8am and 8pm your time. Ask it anything about your business. Try to stump it.

Want the next one in your inbox?

One article like this every week — real numbers for running a service business. Unsubscribe whenever.

Book a demo