In California, a home improvement deposit can’t be more than $1,000 or 10% of the contract price, whichever is less, and taking more is a misdemeanor. Nevada has the same cap for owner-occupied homes. Maryland, Massachusetts, Pennsylvania, Maine and Tennessee cap it at one-third, each with its own conditions. Ohio caps big residential jobs at 10%. Texas, Florida, New York, Arizona and Virginia set no general cap, but some of them control what you do with the money. Below: the rule in each of those states, quoted from the law, the federal 3-day cancellation rule, and how to set a deposit that holds up.
How we researched this: we read each state’s statute or licensing-board page on November 25, 2026 (where a legislature site was down, we say which copy we used), plus the FTC’s Cooling-Off Rule. This is general information, not legal advice; rules change, and your licensing board has the final word.
How much deposit can a contractor ask for in each state?
These are the rules for home improvement work on someone’s home. Commercial work and new-home builders often fall under different rules.
| State | Deposit rule | Applies to | Source |
|---|---|---|---|
| California | $1,000 or 10% of the contract price, whichever is less | Home improvement and pool contracts over $500 | CSLB; B&P §7159.5 |
| Nevada | $1,000 or 10%, whichever is less | Work on a finished, owner-occupied single-family home (contracts from Oct 1, 2023); pools, spas and residential solar have the same cap | NRS 624.970 |
| Maryland | One-third of the contract price, and nothing before the contract is signed | Home improvement contracts | Bus. Reg. §8-617 |
| Massachusetts | One-third, or the cost of special-order materials if that’s more | Contracts over $1,000 on an owner-occupied home of 1 to 4 units | MGL c.142A §2 |
| Pennsylvania | One-third, plus the cost of special-order materials named in the contract | Contracts over $5,000 | HICPA, 73 P.S. §517.9 |
| Maine | One-third of the total price | Home construction contracts over $3,000 on a home of 3 units or fewer | 10 MRSA §1487 |
| Tennessee | One-third, unless you carry the required bond or, after telling the owner in writing they can hold back the final payment, you agree a payment schedule; no payment before the contract is signed | Licensed home improvement work | TCA §62-6-510 (FindLaw copy); TN Attorney General |
| Ohio | 10%, or up to 75% of a special-order item that can’t be returned | Residential contracts over $25,000 (since Sept 20, 2024); not cost-plus contracts | ORC 4722.04 |
| Florida | No cap. Take more than 10% and you must apply for permits within 30 days and start within 90 days of the permits, unless there’s just cause or the customer agrees in writing to longer | Residential work | Fla. Stat. 489.126 |
| New York | No cap. Money taken before the work is substantially done goes into a New York bank escrow account within 5 business days (or you post a bond) | Home improvement contracts | Lien Law §71-a |
| Texas | No cap found. Over $5,000 on a homestead, the money goes into a construction account | Residential homestead work | Prop. Code §162.006 (texas.public.law copy) |
| Arizona | No general cap; the contract must state the deposit. In-ground pools and spas: 15% (unless bonded). Repairs after a catastrophic storm: 50% | Contracts over $1,000 | ARS 32-1158 |
| Virginia | No cap; the contract must state the down payment. The contractors’ board recommends about 10%, or about 30% when custom-made items are involved | Licensed contractors | 18VAC50-22-260; DPOR |
| Minnesota | No cap found. The Attorney General calls a large down payment a warning sign | Residential building | Minnesota AG |
| New Jersey | No cap found; the contract can’t make a down payment look like the full price | Home improvement | N.J.A.C. 13:45A-16.2 |
Not listed: we couldn’t read Wisconsin’s or Connecticut’s rules on their official sites on the day, and we didn’t check Oregon. If your state isn’t here, ask your licensing board before you write a deposit into a contract.
Three details trip people up:
- California has no special-order exception. The CSLB says the cap applies “for a home improvement job or swimming pool… There are no exceptions for special-order materials.” After the down payment, you can’t take money ahead of the work done or materials delivered. Breaking the rule is a misdemeanor.
- Some caps lift with a bond. California (a board-approved blanket bond), Nevada (a $100,000 bond) and Tennessee (a performance and payment bond) all let a bonded contractor take more. Check your board’s exact requirement.
- The threshold matters. Pennsylvania’s one-third cap starts above $5,000, not $1,000 as some pages say, and Ohio’s 10% only covers residential contracts over $25,000.
What is a reasonable deposit for a contractor?
Where your state sets no cap, 10% to one-third is the range the regulators point to. Virginia’s contractors’ board recommends about 10%, or about 30% when the job needs custom-made items. Maryland, Massachusetts and Pennsylvania put the legal ceiling at one-third. We found no survey with a published method that measures what contractors actually charge, so treat any “typical” figure you see as someone’s opinion.
A deposit is easiest to defend when it matches a cost you take on before you start:
- Special-order materials that can’t be returned (windows, cabinets, a custom door). Massachusetts, Pennsylvania and Ohio write this into the law; California doesn’t allow it.
- Holding a spot on the schedule for a big job you’d otherwise fill.
- Permits and design work you pay for up front.
Then bill progress payments as the work gets done. California’s law says payments can’t get ahead of the work, and Tennessee’s Attorney General gives homeowners the same advice.
Hear the receptionist take a real call — it rings your phone in about a minute.
Can a homeowner cancel and get the deposit back?
Often, yes, within three business days, when you signed the contract at their home. The FTC’s Cooling-Off Rule covers sales made away from your place of business: $25 or more at the buyer’s home, or $130 or more somewhere else. The buyer can cancel until midnight of the third business day, and you must refund every payment within 10 business days of getting their cancellation notice (16 CFR 429.1).
It doesn’t cover:
- a visit the customer asked for to repair or maintain their belongings (an appliance, say); repairs to the house itself aren’t in this exception, and anything extra you sell on the visit is covered;
- a sale made entirely by phone or mail;
- a real emergency the customer called you about, where they write out, sign and date their own waiver of the three days;
- a sale that follows talks the customer started at your store or showroom.
Many states add their own cancellation rights and notice wording for home improvement contracts, so the FTC rule is the minimum. Past those windows, whether a deposit comes back depends on your contract and your state; Florida, for one, lets a homeowner demand action by certified letter when work hasn’t started on time.
What should the contract say about the deposit?
Write down:
- The deposit in dollars, not only as a percent. Arizona and Virginia require the amount; it also settles any argument later.
- What it pays for, for example “special-order windows, ordered within 5 days.”
- When the work starts. In Florida, more than 10% sets a 30-day permit clock.
- The progress payments and what has to be finished before each one.
- What happens to the deposit if they cancel, including the 3-day notice when it applies.
- How they can pay. Card, cash or check, it all counts toward your state’s cap.
And take nothing before the contract is signed. Maryland, Pennsylvania and Tennessee ban it outright.
How does Stack Space handle deposits?
You can ask for a deposit when a customer approves an estimate:
- Set it once: off, a percent of the total, or a fixed amount, in Settings or during setup. Each estimate fills it in, and you can change or clear it on any single estimate. Stack Space doesn’t know your state’s cap, and the setting is one percent or one amount, so check the figure on each estimate. In California that means 10% on jobs up to $10,000 and $1,000 above that.
- The customer pays it online by card after they approve (once you’ve connected your Stripe account), or you mark it received in cash or check.
- It comes off the invoice. The deposit is applied to the invoice made from that estimate or its job, so the customer isn’t billed for it twice, and a receipt goes to them by email and text.
Estimates are written and signed online, and the app can draft one from a recorded call’s transcript for you to price. If you charge for the first visit, see service call fees. Local service businesses pick Starter ($125 a month) or Professional ($355). No contracts, cancel anytime.
FAQ
How much deposit can a contractor ask for in California? No more than $1,000 or 10% of the contract price, whichever is less, on a home improvement or pool contract over $500. There’s no exception for special-order materials, and after the deposit, payments can’t run ahead of the work.
Is it normal for a contractor to ask for a deposit? Yes. Most states allow one, and several cap it. Where there’s no cap, Virginia’s contractors’ board suggests about 10%, or about 30% for custom-made items.
Can a contractor ask for 50% up front? Not in California or Nevada, and not in Maryland, Massachusetts or Pennsylvania (contracts over $5,000) unless special-order materials justify it in Massachusetts or Pennsylvania. In states with no cap, such as Texas or Virginia, it isn’t illegal, but regulators warn homeowners against large down payments.
Can a contractor keep my deposit if I cancel? Within three business days of a contract signed at your home, usually not: the FTC’s rule requires a full refund within 10 business days. After that, it depends on the contract and your state’s law.
Does Texas have a contractor deposit law? We found no cap. A contractor with a written contract over $5,000 to improve a homestead must keep the money in a construction account.